Prior to pouring the cement, it is triple reinforced with tie rods for extra strength and durability.
Prior to pouring the cement, it is triple reinforced with tie rods for extra strength and durability.
Viewed: 25 times.

The desert dust and dirt on the boarder was hard on people and equipment.
The desert dust and dirt on the boarder was hard on people and equipment.
Viewed: 28 times.

The path of the wall had to be widened in many locations before construction could begin.
The path of the wall had to be widened in many locations before construction could begin.
Viewed: 33 times.

Powered by Gallery v1 RSS